Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
en:safeav:avt:infrastruct [2025/08/01 22:28] rahulrazdanen:safeav:avt:infrastruct [2025/09/18 11:20] (current) – ToDo checked: raivo.sell
Line 2: Line 2:
 {{:en:iot-open:czapka_m.png?50| Masters (2nd level) classification icon }} {{:en:iot-open:czapka_m.png?50| Masters (2nd level) classification icon }}
  
-<todo @raivo.sell></todo>+<todo @raivo.sell #raivo.sell:2025-09-18></todo>
  
 As discussed earlier, generic V&V process consists of testing the product under test within the ODD. This is generally done with a number of techniques. The central paradigm is to generate a test, execute the test, and have a clear criteria for correctness.  Three major styles of intelligent test generation are currently active:  physical testing, real-world seeding, and virtual testing. As discussed earlier, generic V&V process consists of testing the product under test within the ODD. This is generally done with a number of techniques. The central paradigm is to generate a test, execute the test, and have a clear criteria for correctness.  Three major styles of intelligent test generation are currently active:  physical testing, real-world seeding, and virtual testing.
en/safeav/avt/infrastruct.1754087315.txt.gz · Last modified: 2025/08/01 22:28 by rahulrazdan
CC Attribution-Share Alike 4.0 International
www.chimeric.de Valid CSS Driven by DokuWiki do yourself a favour and use a real browser - get firefox!! Recent changes RSS feed Valid XHTML 1.0