| |Complexity of building | 2 | 4 | 7 | 0,7 | | |Complexity of building | 2 | 4 | 7 | 0,7 | | ||
| |Maneuverability | 4 | 8 | 8 | 0,5 | | |Maneuverability | 4 | 8 | 8 | 0,5 | | ||
| - | |Permeability/ | + | |Permeability |
| |Applicability of HomeLab | 5 | 4 | 5 | 0,9 | | |Applicability of HomeLab | 5 | 4 | 5 | 0,9 | | ||
| |Weight | 5 | 6 | 7 | 0,8 | | |Weight | 5 | 6 | 7 | 0,8 | | ||
| Line 70: | Line 70: | ||
| [{{ : | [{{ : | ||
| - | ~~PB~~ | + | < |
| As an example, Line following sensors electric scheme and respective PCB assembly scheme of the robot' | As an example, Line following sensors electric scheme and respective PCB assembly scheme of the robot' | ||
| Line 78: | Line 78: | ||
| [{{ : | [{{ : | ||
| - | ~~PB~~ | + | < |
| ===== Control system ===== | ===== Control system ===== | ||
| Line 115: | Line 115: | ||
| // | // | ||
| - | // Mainprogram | + | // Main program |
| // | // | ||
| int main(void) | int main(void) | ||
| Line 187: | Line 187: | ||
| ===== Economic calculation ===== | ===== Economic calculation ===== | ||
| - | Economic calculation includes the cost of components and robot production costs | + | Economic calculation includes the cost of components and robot production costs. The currency used in following tables is Estonian Kroon (EEK). |
| - | Tabel of components cost | + | Table of components cost |
| ^Component^Mark^Quantity^Price^Cost^ | ^Component^Mark^Quantity^Price^Cost^ | ||
| Line 233: | Line 233: | ||
| Economic calculation showed that the production cost of the robot is quite high, especially when dealing with a single original, but remains within a predetermined initial task. Production costs could certainly be substantially reduced through the optimization of materials and components, and producing a larger quantity of robots at the same time. During this project we learned how to project a mechatronic system, how to construct and test it, which gave us the first time experience of this kind. | Economic calculation showed that the production cost of the robot is quite high, especially when dealing with a single original, but remains within a predetermined initial task. Production costs could certainly be substantially reduced through the optimization of materials and components, and producing a larger quantity of robots at the same time. During this project we learned how to project a mechatronic system, how to construct and test it, which gave us the first time experience of this kind. | ||
| - | At the end of the work a fact revealed: | + | At the end of the work a fact revealed: |
| In conclusion, we believe that the project was very interesting and instructive, | In conclusion, we believe that the project was very interesting and instructive, | ||